Skip to content
NDISCOVERY
Critical Path poster

Critical Path

The engineering journey to Starship and beyond.

10.01 votes on TMDB2026Movie34m

    Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

    Search on Netflix

    More like this

    Recommended and similar titles from TMDB

    7.4

    Star Trek

    2009 · Movie · Sci-Fi · Action

    6.2

    12:01

    1993 · Movie · Sci-Fi · Thriller

    7.0

    Sunshine

    2007 · Movie · Thriller · Sci-Fi

    Critical Path (2026) — trailer, cast & where to watch · Netflix Discovery